We may earn a commission when you buy through our links. How we make money
The grid is different in each country: the US uses 120/240 V split-phase at 60 Hz, while the UK and Germany use 230/400 V at 50 Hz. An inverter must match your grid, so the answer to question 1 can rule products out. The paperwork rules also differ by country (question 5).
An inverter turns the direct current from solar panels (and batteries) into the alternating current your home uses, and it is often the part of a system that decides what the system can do. Many first-time buyers start with price. These five questions come first, because each one can rule a product out. The guide is for readers in the UK, Germany and the US, and it says where the answer depends on the country.
- 1. Which grid is your home on? The inverter must match its voltage, frequency and phase.
- 2. Do you want grid-tie, battery backup or hybrid, or off-grid?
- 3. How big? Size from your winter energy use and your biggest and surge loads.
- 4. Which battery? Its voltage, chemistry and days of backup decide the inverter.
- 5. Who installs it and what must be filed? Use a licensed electrical professional and follow your country’s rules.
- We have not tested any inverter. This guide is built from the sources listed at the end.
1. Which grid is your home on?
A grid-tie inverter must match the grid’s voltage, frequency and phase. A table of mains supplies lists the United States at 120/240 V (among other supplies) and 60 Hz, and the UK and Germany at 230/400 V and 50 Hz. In North America, homes use split-phase power: two 120 V lines 180° out of phase, with outlets on 120 V and large appliances on 240 V. So a product made for US split-phase output is not made for a UK or German home, and the reverse is also true. Check the output voltage and frequency on the product page before anything else. Our Sun Gold Power guide shows a US-only example.
2. Grid-tie, battery backup, hybrid or off-grid?
Wikipedia describes four kinds. A stand-alone (off-grid) inverter takes direct current from batteries that the panels charge and powers your loads without a grid connection. A grid-tie inverter matches the grid and shuts down when utility power is lost, so it gives no backup during a power cut. A battery backup inverter manages a battery, can export surplus energy and powers selected loads during an outage. An intelligent hybrid coordinates the panels, the battery and the grid, mainly for self-consumption. The shutdown of grid-tie inverters when the grid fails is called anti-islanding: it protects line workers.
3. How big does it need to be?
Sizing guides start with daily energy use in kWh, taken from the month with the most load and the least sun, which is usually winter. The inverter then has to carry your maximum demand, including surge loads such as motors, and the panels and the inverter’s solar input (MPPT) must suit each other: check the maximum and minimum string voltages against the input rating. If you cannot build a load table, Clean Energy Reviews says to ask a professional installer or system designer.
4. Which battery, and for how long?
Batteries are chosen by chemistry, voltage range and the highest rate they can charge at. Clean Energy Reviews suggests at least two days of autonomy for lithium and three or more for lead-acid, after allowing for losses and how deeply you let the battery discharge. Penn State’s rule: the capacity you need in amp-hours is your daily energy use times the days of autonomy, divided by the system’s DC voltage, with 48 V commonly used for larger systems. Check that the inverter supports the battery you want: for example, Sun Gold’s 10 kW US inverter page says it supports 48 V batteries of several kinds, including AGM, gel, flooded and LiFePO4.
5. Who installs it, and what must be filed?
Clean Energy Reviews says solar and battery systems should always be installed by a licensed electrical professional. The paperwork depends on the country.
In the US, the Department of Energy advises that a qualified installer follow local building, fire and electrical codes, that a certified electrician inspect the system, and that net metering depends on your state and utility, so ask the utility. It points to NABCEP certification as the industry credential for installers. In the UK, GOV.UK guidance (published in 2021, and it says the process may change) says the installer must notify the local network operator: for a standard connection a G98 form within 28 days of installation, and for larger systems a G99 application before installation, and the owner must make sure the operator has received it. In Germany, the Marktstammdatenregister says registration is mandatory, not voluntary, and points to separate pages for which installations and deadlines; we did not read those details, so ask your installer which registrations apply.
What else you will need
| You need | Why | Example price (US, 16 November 2026) |
|---|---|---|
| Batteries | They store energy for backup or for use when the sun is down. | Sun Gold’s wall-mounted 10.24 kWh battery: $2,151 (store’s earlier price $3,073). |
| An inverter that suits your grid and battery | It converts and manages the energy (question 1 and 4). | Sun Gold’s 10 kW 48 V split-phase inverter: $1,422 (earlier $2,031). US only. |
| Solar panels | They produce the energy. | Not listed here: prices vary by country and size. |
| A licensed electrical professional | Sizing guides say installation should be done by one. | Get local quotes. |
| Permits and registrations | Rules differ by country (question 5). | Ask your installer, utility or network operator. |
The example prices are US-only products from Sun Gold Power and are there to show the scale of the parts, not as a recommendation. We found no comparable prices from a UK or German seller that we could read.
- An inverter that is made for your country’s voltage, frequency and phase.
- A system sized from your winter energy use, your maximum demand and your battery plan.
- A licensed installer who can tell you which filings apply where you live.
- A product built for another country’s grid because the price is low.
- A grid-tie-only inverter if you want backup during power cuts: it shuts down when the grid fails.
- Treating any maker’s numbers as test results without an independent test.
Questions people ask
Can I use a US inverter in the UK or Germany?
Not as a drop-in. A grid-tie inverter must match the grid’s voltage, frequency and phase, and the US uses 120/240 V at 60 Hz while the UK and Germany use 230/400 V at 50 Hz.
Will a grid-tie inverter work in a power cut?
No. Grid-tie inverters shut down when utility power is lost, which protects line workers. A battery backup or hybrid inverter is needed to power selected loads during an outage.
How many days of battery backup do I need?
Clean Energy Reviews suggests at least two days of autonomy for lithium batteries and three or more for lead-acid, after allowing for losses and depth of discharge.
Do I need a licensed installer?
Clean Energy Reviews says solar and battery systems should always be installed by a licensed electrical professional. In the US the Department of Energy suggests looking for NABCEP certification.
What do I have to tell the authorities?
It depends on the country. In the UK the installer notifies the local network operator (G98 within 28 days, or G99 before installation), under 2021 guidance that may have changed. In Germany registration in the Marktstammdatenregister is mandatory. In the US, ask your utility about net metering and interconnection.
Sources
- Wikipedia: solar inverter (types, MPPT, anti-islanding, voltage and frequency, warranties)
- Wikipedia: mains electricity by country (voltage and frequency table)
- Wikipedia: split-phase electric power
- Clean Energy Reviews: designing off-grid and hybrid solar systems
- Penn State (AE 868): stand-alone system sizing
- US Department of Energy: homeowner’s guide to going solar
- GOV.UK: register energy devices in homes or small businesses (published 31 March 2021; the page says the process may change)
- Marktstammdatenregister (Bundesnetzagentur): registration is mandatory
- Sun Gold Power: 10 kW 48 V split-phase inverter product page (example, US only; price seen on 16 November 2026)
- Sun Gold Power: wall-mounted 10.24 kWh battery product page (example, US only; price seen on 16 November 2026)
Facts, prices and links checked against these sources on 16 Nov 2026.


